Unit 2, Wolf Pack, Hilton Cross Business Park, Wolverhampton, is a self-contained detached building constructed to a market-leading specification, with planning consent for manufacturing, warehousing, and distribution uses. The unit comprises a steel portal frame beneath a pitched, lined roof with profiled clad elevations.
A Prime
Manufacturing
and Logistics
Development
UNIT 2
500 KVA
office accommodation
lighting
EPC A rating
of haunch
depth
level loading doors
dock level loading doors
lights
Cells
parking spaces
floor loading
| Unit 2 | sq ft | sq m |
|---|---|---|
| Warehouse | 57,157 | 5,310 |
| First Floor Offices | 5,126 | 476 |
| Total | 62,283 | 5,786 |
Demographics
Located In The Manufacturing Heart of the Uk
Over 550,000 People
of working age within a drive time of 30 mins
Competitive Costs
for labour, property and operations
17,000 People
actively seeking work in wolverhampton, showing a readily available local workforce
Over 13,000
Automotive & high tech businesses within a 60 minute drive time
3 Million People
Approx, live within a 20 mile radius of wolverhampton
Major Local Occupiers Include:
At the heart
of the regionslogistics network
Wolf Pack, Hilton Cross Business Park is situated at the confluence of the regions motorway network. Located at the northern fringe of the Wolverhampton and Black Country conurbation, the park has direct access from the A460 Cannock Road onto the M54 Motorway at Junction 1. Providing access to the M6, M6 Toll, M5 and national motorway network.
At the heart
of the regions
logistics network
Wolf Pack, Hilton Cross Business Park is situated at the confluence of the regions motorway network. Located at the northern fringe of the Wolverhampton and Black Country conurbation, the park has direct access from the A460 Cannock Road onto the M54 Motorway at Junction 1. Providing access to the M6, M6 Toll, M5 and national motorway network.
The detached unit is constructed of a steel portal frame beneath a pitched lined roof surmounted by clad elevations and benefit from a market leading specification.
EPC A rating
2 double height dock level loading doors
50kN/m2 floor loading
Provision for vehicle charging in all parking spaces, as well as in loading yards
10 HGV parking spaces
24/7 day operations
94 separate car parking spaces
Power supply 800 KVA (Up to 3.2 MVA available) 12.5m to underside of haunch
10% PV Cells
48-58m yard depths
Target BREEAM ‘Excellent’
Fully fitted first floor office accommodation
2 level loading and 8 dock level loading doors
